Skip to main content
24/7 Emergency Response: +44 (0)23 8033 1551
Header Image

Capping Stack Installation

A construction supply vessel will deploy the capped stack above the incident well and lower it to the failed BOP. Alternatively, the capping stack may be deployed from a rig.

Header Image
Decorative graphic

A construction supply vessel will deploy the capped stack above the incident well and lower it onto the incident well.